Public Comment Letters

Search for the Final Comment Letter for a project that technical guidance staff at New Mexico Department of Wildlife have reviewed using the filters below. If you select multiple search terms in the "Search Terms" box, the filter will return all projects that are associated with at least one of the search terms you selected.

Comment Title Description Search Terms Date Final Comment Letter
ACR II Solar Project The proposed solar project would consist of ground-mounted photovoltaic arrays, electrical inverters (pads), electrical wiring, and above- and below-ground collector wiring. The proposed project would be located on private land approximately 6 miles northwest of Hobbs, Lea County, New Mexico, and would cover approximately 1,517 acres adjoining an existing solar energy project area. The proposed project area is mostly undeveloped but contains existing infrastructure such as access roads, fencing, and transmission lines, and a parcel with active cattle grazing. A site survey for T&E species and other sensitive flora and fauna in the proposed project area was completed by a professional biologist in February 2026. Design plans and mitigation measures are still being finalized for this project, but recommendations to reduce wildlife impacts will include conducting ground disturbing activities outside of migratory bird nesting season(s) and retaining existing vegetation and wildlife habitat features wherever feasible. 2026-02-18 public_comment_letter_NMERT-5578.pdf
Modification 26-1 Cebolleta Uranium Exploration Project On January 26, 2026 the New Mexico Mining and Minerals Division (MMD) received an application from Cibola Resources, LLC (Cibola) to modify the minimal impact exploration mining permit for its Cebolleta Uranium Exploration Project Permit No. CI018EM. The application for permit modification was assigned Modification 26-1 by MMD. The Modification 26-1 application proposes changing the drilling method to a mud pit system versus the previously used closed loop drilling. MMD reviewed the Modification 26-1 application and deemed the application administratively complete. Mine Exploration, Mine Permit 2026-02-18 public_comment_letter_NMERT-5571.pdf
Lincoln County Exploratory report for species list. Timing, activities, equipment, materials, extent of ground disturbance, wildlife surveys, and mitigation are not yet defined. The purpose of this report is for exploratory purposes only and to obtain a species list. Exploratory report for species list. Timing, activities, equipment, materials, extent of ground disturbance, wildlife surveys, and mitigation are not yet defined. The purpose of this report is for exploratory purposes only and to obtain a species list. Proposed Action 2026-02-17 public_comment_letter_NMERT-5632.pdf
M820B MP 12.12 Hobbs to Plains Pipe Replacement Northern Natural Gas (Northern) owns and operates natural gas transmission pipeline systems and associated appurtenances in the State of New Mexico. Northern is proposing to replace an approximate 4,600-foot section of pipe along their existing 26-inch-diameter M820B natural gas pipeline at approximate milepost 12.12 via open cut methods. The M820B MP 12.12 Hobbs to Plains Pipe Replacement Project (Project) is located in Township 17 South, Range 38 East, Sections 35 and 36 in Lea County, New Mexico. Construction activities are proposed to start in June 2026, or upon issuance of all applicable permits, and last approximately 30 days. The Project is regulated by the Federal Energy Regulatory Commission under an automatic blanket. Northern proposes to utilize one irregular shaped temporary workspace (TWS) measuring (10.35 acres) and two irregular shaped extra temporary workspaces (ETWS), ETWS 1 measures (8.03 acres) and ETWS 2 measures (3.03 acres), and one irregular shaped Staging Area measuring (2.14 acres). Access to the Project areas will be achieved using the existing M820B pipeline right-of-way from existing public roadways (Hamilton Drive). Project activities may result in up to 21.41 acres of ground disturbance, no ground disturbance is expected in the Staging Area. All Project workspaces were reviewed for environmental concerns centered within an approximate 43.43-acre Environmental Clearance Boundary (ECB). Ground disturbing activities may include excavation, topsoil segregation, removal of existing pipe section, installation of new pipe section and ancillary equipment; backfill of excavated soil; minor restoration and grading back to pre-construction conditions; and seeding, as required. All ground surface areas will be returned to preconstruction conditions upon project completion. Oil and Gas Pipeline, Proposed Action 2026-02-16 public_comment_letter_NMERT-5612.pdf
Lea County Project This request is for due diligence for parcel assessment. Potential development is unknown to the consultant at this time. The project area is approximately 640 acres. We are planning to conduct a preliminary assessment of the existing conditions. At this time, there is no known information on the timing of activities, equipment and/or materials used, extent of ground disturbance, and wildlife surveys or mitigation that have been built in to the project. This request is for due diligence for parcel assessment. Potential development is unknown to the consultant at this time. The project area is approximately 640 acres. We are planning to conduct a preliminary assessment of the existing conditions. At this time, there is no known information on the timing of activities, equipment and/or materials used, extent of ground disturbance, and wildlife surveys or mitigation that have been built in to the project. Proposed Action 2026-02-12 public_comment_letter_NMERT-5506.pdf
Tranmission Eval Site Evaluation Energy Development, Proposed Action, Transmission Line 2026-02-12 public_comment_letter_NMERT-5608.pdf
Study Area Eval Proposed Action, Transmission Line 2026-02-12 public_comment_letter_NMERT-5609.pdf
102192, confidential northern routes Transmission project; confidential routes 2026-02-10 public_comment_letter_NMERT-5562.pdf
102192 confidential southern routes confidential project for species list only; linear infrastructure 2026-02-10 public_comment_letter_NMERT-5563.pdf
State PC Com #001 This assessment was performed for the above-referenced project in accordance with Terracon project number AR267029 dated January 27, 2026. This desktop review was performed by qualified biologists but is limited and does not constitute an on-site evaluation of habitat suitability or presence/absence survey for a particular species by a qualified biologist. Proposed Action 2026-02-09 public_comment_letter_NMERT-5593.pdf
Igloo Proposed development includes extension of a well pad for future development of oil and gas. Oil and Gas, Proposed Action 2026-02-06 public_comment_letter_NMERT-5537.pdf
BLM Truck Station Proposed pad construction project Proposed Action, Threatened or Endangered Species 2026-02-06 public_comment_letter_NMERT-5540.pdf
Noel Pipeline Proposed pipeline Proposed Action, Threatened or Endangered Species 2026-02-06 public_comment_letter_NMERT-5542.pdf
Donkey Pot Roast Proposed pipeline project Proposed Action, Threatened or Endangered Species 2026-02-06 public_comment_letter_NMERT-5544.pdf
Phillips Lea #8 Soil remediation will be conducted by excavation of soil with a backhoe. All excavated soil will be hauled to a disposal facility, and the excavation will be backfilled with clean soil. 2026-02-06 public_comment_letter_NMERT-5547.pdf
Phillips Lea #8 Soil remediation Threatened or Endangered Species 2026-02-06 public_comment_letter_NMERT-5548.pdf
Tiger Paw 22 Facility 2 Remediation project for oil and gas pad about 6.37 acres in Eddy Co. Project set to be complete in three months. Oil and Gas Pipeline, Proposed Action 2026-02-06 public_comment_letter_NMERT-5550.pdf
Beretta 15 State Com #2 Oil and gas pad approximately 1.93 acres in Eddy Co. Set to be reclaimed within three months. Oil and Gas Pipeline, Proposed Action 2026-02-06 public_comment_letter_NMERT-5551.pdf
Modifications to the “PNM Los Padillas” Telecommunication Facility (Site No. NM01445B) To provide service in the area, T-Mobile proposes to modify a cellular communications facility once it is constructed by another proponent. The project entails adding equipment to an 85-foot wood pole. On the ground level, a new 80 square foot steel platform will be installed to support new equipment cabinets and batteries. A new generator will be installed on a new 8-foot by 4-foot concrete pad. The new equipment will be housed in a 400-square foot concrete block enclosure. Approximately 100-feet of new underground conduit will be installed to connect the new ground equipment to the pole. Work is expected to start in mid-2026 and take 6-8 weeks to complete. Cell Tower, Communications, Proposed Action 2026-02-05 public_comment_letter_NMERT-5557.pdf
Forehand Ranch East Proposed development includes building of approx. 5 acre well pad for future development of oil gas pad. Oil and Gas, Proposed Action 2026-02-05 public_comment_letter_NMERT-5536.pdf
Draft Environmental Assessment for the Rehabilitation of the Acequia de Chamita, Rio Arriba County, New Mexico The U.S. Army Corps of Engineers has prepared a Draft Environmental Assessment for the modification and improvement of an existing acequia. Project entails installation of fiber-reinforced, concrete-lined open channel (800ft) and concrete pipe (300 ft). Project also entails a staging area. Environmental Assessment, Water Diversions/Irrigation, Water Infrastructure 2026-02-04 public_comment_letter_NMERT-5514.pdf
RC test project exploratory Proposed Action 2026-02-04 public_comment_letter_NMERT-5482.pdf
Lusk 16 State #006 Exploratory Proposed Action 2026-02-04 public_comment_letter_NMERT-5569.pdf
Lusk 16 State #006 Exploratory 2026-02-04 public_comment_letter_NMERT-5570.pdf
Butterfield Preliminary data for project Proposed Action 2026-02-03 public_comment_letter_NMERT-5469.pdf

Pages