Search for the Final Comment Letter for a project that technical guidance staff at New Mexico Department of Wildlife have reviewed using the filters below. If you select multiple search terms in the "Search Terms" box, the filter will return all projects that are associated with at least one of the search terms you selected.
Comment Title
Description
Search Terms
Date
Final Comment Letter
Healthy Futures - Technical Assistance
Healthy Futures has applied for the Rural Business Development Grant (RBDG) to rural small businesses and agriculture producers providing Technical Assistance with best business practices, management skills, marketing including social media, business plans, business analysis and attract investment opportunities.
The CN Dam relies on raw water from the reservoir for consumption, irrigation, and maintenance activities. Most of the main water line system is approximately 80 years old and is beyond the service life. This project's purpose is to revitalize the systems controls and treatment of water to maintain mission readiness. The work included would replace the reverse osmosis water treatment system, main piping system, electrical control panel(s), sensors, valve actuators and pumps for the main water pump in the Administration Building and pumps in main dam hydropower house.
Solar facility for proposed development. Site clearing and grading will be required. Proposed habitat assessment, plant and wildlife surveys are works in progress.
Need to know what species are within project area for State and Federal agencies restoration concepts document. This will help create a document for client on next steps.
The Project is a proposed solar energy and battery storage facility that consists of an approximately 1,870-acre area located in Chaves County, New Mexico. The final design of the proposed solar energy and battery storage facility is still in development. For the purposes of this request, the proposed Project will likely involve the installation of photovoltaic modules, electrochemical batteries, inverters, transformers, an underground collection system, facility access roads, security fencing, Supervisory Control and Data Acquisition systems, operation and maintenance structures, and temporary parking and laydown areas across much of the project area. Clearing of onsite vegetation and grading, if necessary, will occur before the installation of Project infrastructure. The Project intends to avoid impacts to waters of the U.S. to the greatest extent practicable.
The Heart of the Gila Property (the "Property") is an approximately 30.081-acre property located in a unique area of the Mogollon Mountains known as Gila Hot Springs, N.M about 40 miles north of Silver City. The Property is comprised of one parcel consisting of 30.081 that is located off NM-15 in Grant County, New Mexico (Map 1) about 30 miles north of the Chino and Cobre Mine complexes, and 35 miles from the Tyrone Mine. The Property is an inholding in the Gila National Forest and falls within the Arizona/New Mexico Mountain ecoregion, with a mixed composition of Madrean Lower Montane woodlands and upper Gila River riparian communities. Elevations range from about 5,500 feet at the southern property boundary to nearly 5,880 feet at the western border in the montane slopes. The property is bisected by a 0.25-mile reach of the West Fork of the Gila River, just before its confluence with the East Fork of the Gila River where it makes a south-westerly turn. There are approximately 3.76 acres of riverine and marsh wetlands with an additional 3.4 acres of riparian habitat within the floodplain and stream braids (National Wetlands Inventory Geodatabase).
At this time, I do not have a project description available. Details are currently unavailable, but I will provide information as soon as it becomes accessible. As of now, no specific project description exists, but updates will be shared when possible. Thank you for your patience.
Removal of National Environmental Policy Act Implementing Regulations
Interim final rule removing the Council on Environmental Quality (CEQ) regulations implementing the National Environmental Policy Act (NEPA) from the Code of Federal Regulations. Interim final rule requests comments on this action and related matters to inform CEQ's decision making. Being reviewed and commented on by NMISC, EMNRD, and NMDGF.
Planning, Proposed Rulemaking, River/Stream Management, Solar Energy, Threatened or Endangered Species, Wind Energy
Albuquerque Reach Habitat Restoration Project - BOR and NMISC programmatic EA
The New Mexico Interstate Stream Commission (NMISC) is proposing to do a multi-phased riparian and floodplain habitat restoration project in the Angostura/Albuquerque reach of the Rio Grande between River Miles 194 and 172.5. The project is located on land administered by the Middle Rio Grande Conservancy District and the Bureau of Reclamation, the lead federal agency. The project consists of 80 separate habitat restoration project areas on the banks of the Rio Grande and on select islands within the channel, as well as proposed spoils and access road plans, starting on the north side of the Alameda Bridge (State Road 528) and ending on the south side of the I-25 bridge in the South Valley. The project would also provide maintenance and adaptive management of existing and newly constructed habitat restoration areas. The purpose of the project is to benefit the Rio Grande silvery minnow (Hybognathus amarus) and other federally listed species that occur in the project area. The Bureau of Reclamation has prepared an Environmental Assessment (EA) document to analyze potential impacts associated with the proposed project in accordance with the National Environmental Policy Act (NEPA) of 1969, 40 CFR Parts 1500-1508 process. This notice announces the availability of the EA for public review and a 30-day public comment period from February 24 to March 25, 2025. The EA can be found on the Bureau of Reclamation's website at https://www.usbr.gov/uc/DocLibrary/ea.html.
Commercial Cannabis Grow, Energy Generation, and Residential Development near Regina, NM
Project proponent contacted New Mexico Department of Game and Fish and this project is being entered on their behalf. Proposed activities include building a facility to house a commercial cannabis growing and processing operation that will also include energy cogeneration by burning natural gas. The cannabis facility will include parking lot construction. Will also include development of up to 13 homes to house facility employees. Also includes solar array installed on the roof of the cannabis facility.
Minimal Impaction Exploration Permit Modification Application, Summa Silver Mogollon Project
On February 5, 2025, the Mining and Minerals Division ("MMD") received a revised permit modification application from Everett Ecological, on behalf of Summa Silver Corporation, for a modification to their minimal impact exploration Permit No. CA027EM in Catron County, New Mexico. The permit modification proposes the construction of a new access road and the clarification of staging area locations. Pursuant to 19.10.3.302.G NMAC, MMD is requesting comments from your agency regarding this application. The application from the operator can be downloaded from MMD's website at https://www.emnrd.nm.gov/mmd/mining-act-reclamation-program/pending-and-approved-explorationapplications/minimal-impact/ca027em-summa-silver-mogollon/
Site Wide Closure/Closeout Plan Update 2024, Chino Mine
On October 31, 2024, the Mining and Minerals Division ("MMD") received an application from Freeport-McMoRan Chino Mines Company ("FMI") to update their existing Closure/Closeout Plan ("CCP") for the Chino Mine ("Chino"), Permit No. GR009RE. The purpose of the 2024 CCP Update is to present a comprehensive reclamation plan for Chino that is consistent with all applicable federal and state regulatory requirements and permit conditions. The updated reclamation plan is used to calculate a financial assurance cost estimate for Chino that will meet the financial assurance requirements of 19.10.12 NMAC.
El Segundo Mine Permit Revision, Highwall Miner Application 2024
The mine requests to add the highwall miner technique to the potential methods used for coal extraction on the mine site. A copy of the revision application is available for public inspection at the following locations: McKinley County Courthouse, County Clerk's Office, 201 W. Hill, Gallup, New Mexico; the Grants Public Library, 1101 N First St., Grants, New Mexico; and on the New Mexico Mining and Minerals Division Website at https://www.emnrd.nm.gov/mmd/public-notices/.
A formal public meeting will be hosted by the Director and PNRC on Wednesday, February 19, 2024 at 1PM at the Grants Public Library, 1101 N First St., Grants, New Mexico to address any public concerns.
We would appreciate receiving your comments no later than COB Friday, March 21, 2025. Should you have any questions or concerns, please feel free to contact me at (505) 670-9997 (cell), or Erik.Munroe@emnrd.nm.gov.
Management Plan for Navajo Lake State Park. Design Office (DO) is assisting New Mexico State Parks (NMSP)with the
development of the Navajo Lake State Park Management Plan. The project area is shown
below and includes a 4,566-acre portion of the Navajo Lake State Park along the San Juan
River Corridor, downstream of Navajo Dam. The corridor is popular for fishing and recreation
and includes 4.3 miles of Special Trout Waters (known as Red Chili Waters).
In November 2022, the Design Office (DO) team (which included Otak and MASS Design)
prepared a Draft Existing Conditions and Issues report. Other early consulting support was
provided by WestLand Resources (from Tucson, AZ) and reportedly included habitat and
cultural surveys (not yet reviewed by Biohabitats). Since that time, DO has been involved in
designing improvements in two locations -Texas Hole Day Use Area and Crusher Hole Day
Use and Campground Area. The Crusher Hole area has identified invasive species issues
(Tamarisk) and the Texas Hole area includes a sediment retention basin which was identified
in 2022 as needing long-term planning to address sediment management and a potential
strategy for upstream restoration.
At this time, Design Office would like assistance integrating ecological considerations into the
Management Plan process. Specifically, DO would like Biohabitats to provide ecological
planning guidance and nature-based design strategies that will help support the health of
Project
Cain Ranch is being assessed for a potential conservation easement project. As part of this process, the New mexico land conservancy as the land trust conducts due diligence to investigate the conservation values of the property. The project is in partial property rights only and does not contain any physical alteration or ground disturbing activities.
Search for the Final Comment Letter for a project that technical guidance staff at New Mexico Department of Wildlife have reviewed using the filters below. If you select multiple search terms in the "Search Terms" box, the filter will return all projects that are associated with at least one of the search terms you selected.
Pages